Waverly substation interconnection queue
1 active project totalling 80 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
80active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1224 | Waverly 115 kV | 115 | 80 | Battery | Active |
| AG2-427 | Waverly 115 kV | 115 | 66.3 | Hybrid | Withdrawn |
| AF1-308 | Waverly 138 kV | 138 | 36 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.