Waverly substation interconnection queue

1 active project totaling 80 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2023 to Sep 2031 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

1active projects
80active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1224 Waverly 115 kV 115 80 Battery Active Sep 2031
AG2-427 Waverly 115 kV 115 66.3 Hybrid Withdrawn Apr 2028
AF1-308 Waverly 138 kV 138 36 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, VA

All 39 PJM queue filings in Sussex County, VA.

Other PJM queue substations in Pike County, OH

All 9 PJM queue filings in Pike County, OH.