Sowego substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Sowego as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Dec 2023 to Dec 2030 (3 filings).

Transmission owner as filed: Dominion (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1173 Sowego 115 kV 115 190 Battery Withdrawn Dec 2030
AH2-084 Sowego n/r 125 Battery Withdrawn Jun 2027
AG1-043 Sowego 115 kV 115 36 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-28C01-1173Terminal status190 Active → Withdrawn

Other PJM queue substations in Fauquier County, VA

All 52 PJM queue filings in Fauquier County, VA.

Other PJM queue substations in Accomack County, VA

All 47 PJM queue filings in Accomack County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first