Bremo-Kidds Store substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Bremo-Kidds Store as the point of interconnection, all in VA.
Target commercial operation dates as filed run from May 2020 to Dec 2021 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-173 | Bremo-Kidds Store 115 kV | 115 | 48 | Solar | Withdrawn | May 2020 |
| AE1-073 | Bremo-Kidds Store 115 kV | 115 | 48 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fluvanna County, VA
- Cunningham - Elmont: 2 active, 3,238 MW of 3 filed
- Bremo: 3 active, 2,185 MW of 4 filed
- Cunningham: 6 active, 1,704.6 MW of 7 filed
- Fork Union: none active of 2 filed
- Kidds Store - Fork Union II: none active of 2 filed
- Shockoe DP-Chatham: none active of 2 filed
Other PJM queue substations in Accomack County, VA
- Morrisville: 1 active, 400 MW of 12 filed
- Suffolk: 4 active, 120.8 MW of 14 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Oak Hall: 8 active, 47.2 MW of 10 filed
- Tasley: 2 active, 16.1 MW of 9 filed
- Wattsville: 1 active, 9 MW of 3 filed
- Northern Neck: 3 active, 8.4 MW of 6 filed
- Tasley-Kellam: none active of 4 filed
- Birchwood: none active of 3 filed
- Sowego: none active of 3 filed
- Briery DP-Clover: none active of 2 filed
- Carson – Rogers Road: none active of 2 filed
- New Church: none active of 2 filed