Clubhouse-Sapony substation interconnection queue
1 active project totaling 89 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Clubhouse-Sapony as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Dec 2022 to Feb 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
1active projects
89active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-033 | Enclave Solar Energy Center | 230 | 89 | Solar | Engineering and Procurement | Feb 2030 |
| AF1-266 | Clubhouse-Sapony 230 kV | 230 | 74.5 | Battery | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-02 | AE2-033 | Status change | n/a | Suspended → Engineering and Procurement |
Other PJM queue substations in Sussex County, VA
- Carson-Suffolk: 1 active, 480 MW of 4 filed
- Carson-Rogers Road: 1 active, 207.2 MW of 2 filed
- Carson-Septa: 1 active, 90 MW of 2 filed
- Rogers Road - Carson: 1 active, 85 MW of 3 filed
- Waverly: 1 active, 80 MW of 3 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Bakers Pond-Ivor: 1 active, 43.3 MW of 2 filed
- Sapony: 2 active, 29.5 MW of 7 filed
- Wakefield: none active of 8 filed
- Bakers Pond-Bell Ave: none active of 2 filed
- Brunswick-Gasburg: none active of 2 filed
- Carson-Rawlings: none active of 2 filed
Other PJM queue substations in Dinwiddie County, VA
- Carson - Rawlings: 5 active, 2,205 MW of 6 filed
- Carson: 2 active, 200 MW of 3 filed
- Sapony: 2 active, 29.5 MW of 7 filed
- Locks: 1 active, 0.2 MW of 3 filed
- Carson-Rawlings: none active of 2 filed
- Reams: none active of 2 filed