Tasley-Kellam substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| V4-064 | Tasley-Kellam 69kV | 69 | 7.6 | Solar | Withdrawn |
| W1-008 | Tasley-Kellam 69kV | 69 | 7.6 | Solar | Withdrawn |
| W1-009 | Tasley-Kellam 69kV | 69 | 7.6 | Solar | Withdrawn |
| Y1-008 | Tasley-Kellam 69kV | 69 | 6.5 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.