Rogers Road substation interconnection queue
2 active projects totaling 67 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name Rogers Road as the point of interconnection, all in Greensville County, VA.
Target commercial operation dates as filed run from Aug 2023 to Dec 2026 (5 filings).
Transmission owner as filed: Dominion (2 filings).
2active projects
67active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-677 | Rogers Road 500 kV | 500 | 67 | Gas | Active | Dec 2025 |
| AH1-385 | Rogers Road 500 kV | 500 | 65.4 | Solar | Withdrawn | Dec 2025 |
| AI2-277 | Rogers Road 500 kV | 500 | 45 | Battery | Withdrawn | Dec 2026 |
| AG1-160 | Rogers Road 500 kV | 500 | 30 | Battery | Withdrawn | Dec 2023 |
| AE2-183 | Greensville Power Station | 500 | 0 | Gas | In Service | Aug 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Greensville County, VA
- Heritage-Carson: 1 active, 1,630 MW of 2 filed
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Carson-Rogers Road: 1 active, 207.2 MW of 2 filed
- Rogers Road - Carson: 1 active, 85 MW of 3 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Clubhouse-Lakeview: 1 active, 67 MW of 3 filed
- Brink: 1 active, 44 MW of 2 filed
- Emporia-Trego: 1 active, 42 MW of 3 filed
- Brink-Trego: 3 active, 40.4 MW of 3 filed
- Fields: 2 active, 17 MW of 3 filed
- Clubhouse- Purdy: none active of 6 filed
- Clubhouse: none active of 3 filed
- Carson – Rogers Road: none active of 2 filed
- Clubhouse-Freeman: none active of 2 filed