Carson – Rogers Road substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Carson – Rogers Road as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Mar 2024 to Dec 2024 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-465 Carson – Rogers Road 500 kV 500 120 Solar Withdrawn Dec 2024
AG2-258 Carson – Rogers Road 500 kV 500 60 Solar Withdrawn Mar 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Carson – Rogers Road” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Greensville County, VA

All 58 PJM queue filings in Greensville County, VA.

Other PJM queue substations in Accomack County, VA

All 47 PJM queue filings in Accomack County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first