5 active projects totaling 341.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2025 to Dec 2030 (7 filings). 5 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (6 filings).

5active projects
341.6active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-570 Heritage - Wake 500 kV 500 100 Solar Active Dec 2028
AG2-069 Heritage - Wake 500 kV 500 90 Solar Active Dec 2029
C01-1731 Heritage - Wake 500 kV 500 90 Solar Withdrawn Sep 2030
AG2-068 Heritage - Wake 500 kV 500 60 Solar Active Dec 2029
AG2-369 Heritage - Wake 500 kV 500 51.6 Solar Active Dec 2030
AG2-571 Heritage - Wake 500 kV 500 40 Battery Active Dec 2028
AG2-067 Heritage - Wake 500 kV 500 30 Solar Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Brunswick County, VA

All 45 PJM queue filings in Brunswick County, VA.

Other PJM queue substations in Halifax County, NC

All 22 PJM queue filings in Halifax County, NC.

Other PJM queue substations in Greensville County, VA

All 58 PJM queue filings in Greensville County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first