Sapony substation interconnection queue

2 active projects totaling 29.5 MW in the PJM queue, plus 5 with terminal status (shown grayed).

7 PJM queue filings name Sapony as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Dec 2017 to Dec 2025 (7 filings).

Transmission owner as filed: Dominion (1 filing).

2active projects
29.5active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD1-034 Sapony 230 kV 230 44.9 Solar Withdrawn Dec 2020
AH2-268 Sapony 34.5 kV 34.5 33.7 Hybrid Withdrawn Jul 2025
AI2-033 Sapony 34.5kV 34.5 24 Solar Withdrawn Oct 2024
AE2-040 Shands Energy Center 34.5 15.7 Battery In Service Dec 2025
AB2-025 Sapony 34.5kV 34.5 13.8 Solar In Service Dec 2017
AG2-431 Sapony 34.5 kV 34.5 12.5 Solar Withdrawn Nov 2023
AG1-393 DW-Lew Jones Solar 34.5 12 Solar Withdrawn Mar 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, VA

All 39 PJM queue filings in Sussex County, VA.

Other PJM queue substations in Dinwiddie County, VA

All 20 PJM queue filings in Dinwiddie County, VA.