Carson-Septa substation interconnection queue
1 active project totalling 90 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
90active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-311 | Carson-Septa 500 kV | 500 | 240 | Solar | Withdrawn |
| AE2-051 | Big Pine Solar | 500 | 90 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.