Bakers Pond-Ivor substation interconnection queue
1 active project totalling 43.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
43.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-039 | Bakers Pond-Ivor 115kV | 115 | 47 | Solar | Withdrawn |
| AD1-082 | Waverly Solar | 115 | 43.3 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.