Bakers Pond-Ivor substation interconnection queue

1 active project totalling 43.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
43.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-039 Bakers Pond-Ivor 115kV 115 47 Solar Withdrawn
AD1-082 Waverly Solar 115 43.3 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.