Bakers Pond-Ivor substation interconnection queue
1 active project totaling 43.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Bakers Pond-Ivor as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Dec 2018 to Feb 2024 (2 filings).
1active projects
43.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-039 | Bakers Pond-Ivor 115kV | 115 | 47 | Solar | Withdrawn | Dec 2018 |
| AD1-082 | Waverly Solar | 115 | 43.3 | Solar | In Service | Feb 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Southampton County, VA
- Boykins: 1 active, 100 MW of 8 filed
- Southampton: 2 active, 81.1 MW of 7 filed
- Boykins-Handsome: 1 active, 38 MW of 2 filed
- Ivor-Oak Ridge: 1 active, 32.3 MW of 2 filed
- Franklin: none active of 7 filed
- Southampton- Handsom: none active of 5 filed
- Watkins Corner: none active of 3 filed
- Bell Avenue: none active of 2 filed
- Boykins-Murphy: none active of 2 filed
Other PJM queue substations in Sussex County, VA
- Carson-Suffolk: 1 active, 480 MW of 4 filed
- Carson-Rogers Road: 1 active, 207.2 MW of 2 filed
- Carson-Septa: 1 active, 90 MW of 2 filed
- Clubhouse-Sapony: 1 active, 89 MW of 2 filed
- Rogers Road - Carson: 1 active, 85 MW of 3 filed
- Waverly: 1 active, 80 MW of 3 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Sapony: 2 active, 29.5 MW of 7 filed
- Wakefield: none active of 8 filed
- Bakers Pond-Bell Ave: none active of 2 filed
- Brunswick-Gasburg: none active of 2 filed
- Carson-Rawlings: none active of 2 filed