Suffolk substation interconnection queue
4 active projects totaling 120.8 MW in the PJM queue, plus 10 with terminal status (shown grayed).
14 PJM queue filings name Suffolk as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Dec 2011 to Dec 2031 (14 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI1-102 | Suffolk 115 kV | 115 | 100 | Battery | Withdrawn | Sep 2029 |
| C01-1685 | Suffolk 230 kV | 230 | 74.5 | Battery | Active | Dec 2031 |
| AH2-107 | Suffolk 115 kV | 115 | 69 | Battery | Withdrawn | Dec 2024 |
| AG1-518 | Suffolk 230 kV | 230 | 50 | Hybrid | Withdrawn | Sep 2023 |
| C01-1686 | Suffolk 230 kV | 230 | 24.5 | Battery | Active | Dec 2031 |
| X1-053 | Suffolk 34.5kV | 34.5 | 20 | Gas | Withdrawn | Dec 2011 |
| AE2-104 | Switchgrass Solar 1 | 115 | 18.9 | Solar | Withdrawn | Oct 2025 |
| AE2-225 | Hosier Road Solar | 34 | 12 | Solar | Withdrawn | Nov 2022 |
| AF2-043 | Pleasant Hill Solar | 34.5 | 12 | Solar | In Service | Dec 2022 |
| AF1-032 | Stratford Solar Center | 34.5 | 9.8 | Solar | In Service | Feb 2023 |
| AE2-229 | Hosier Road Solar II | 34 | 9 | Solar | Withdrawn | Nov 2022 |
| Y2-066 | Suffolk Landfill Units 1-10 | 34.5 | 9 | Gas | Withdrawn | Jun 2015 |
| AF1-016 | Suffolk 115 kV | 115 | 7.7 | Solar | Withdrawn | Nov 2021 |
| AF2-110 | Switchgrass Solar 1 | 115 | 7.7 | Solar | Withdrawn | Oct 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Suffolk (DOM, 10 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in City of Suffolk, VA
- Suffolk - Sunbury: 2 active, 165 MW of 3 filed
- Kings Fork: 1 active, 9.7 MW of 4 filed
- Elmont: none active of 3 filed
- Suffolk-Holland: none active of 2 filed
Other PJM queue substations in Suffolk County, VA
- Suffolk - Nucor Tap: 2 active, 541 MW of 4 filed
- Suffolk - Sunbury: 2 active, 165 MW of 3 filed
- Copeland DP - Holland: 2 active, 110 MW of 2 filed
Other PJM queue substations in Accomack County, VA
- Morrisville: 1 active, 400 MW of 12 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Oak Hall: 8 active, 47.2 MW of 10 filed
- Tasley: 2 active, 16.1 MW of 9 filed
- Wattsville: 1 active, 9 MW of 3 filed
- Northern Neck: 3 active, 8.4 MW of 6 filed
- Tasley-Kellam: none active of 4 filed
- Birchwood: none active of 3 filed
- Sowego: none active of 3 filed
- Bremo-Kidds Store: none active of 2 filed
- Briery DP-Clover: none active of 2 filed
- Carson – Rogers Road: none active of 2 filed
- New Church: none active of 2 filed