Tasley substation interconnection queue

2 active projects totaling 16.1 MW in the PJM queue, plus 7 with terminal status (shown grayed).

9 PJM queue filings name Tasley as the point of interconnection, all in Accomack County, VA.

Target commercial operation dates as filed run from Mar 2009 to Sep 2026 (9 filings).

Transmission owner as filed: ODEC (1 filing).

2active projects
16.1active MW
9total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-050 Tasley 69kV 69 20 Battery Withdrawn Jun 2025
C01-2179 Tasley 24.9 kV 24.9 9.4 Battery Active Sep 2026
AC1-009 Tasley 69kV 69 7.6 Solar Withdrawn Mar 2019
AB2-033 Tasley 69kV 69 7.2 Solar Withdrawn May 2017
T66 Tasley n/r 6.7 Other In Service Mar 2009
AC1-052 Tasley 69kV 69 6.4 Solar Withdrawn May 2017
AF1-243 Tasley 25 kV 25 5 Battery Withdrawn Jun 2020
V4-022 Tasley Solar n/r 1.9 Solar Withdrawn Nov 2019
AB2-030 Tasley 25kV 25 0 Battery Withdrawn Dec 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Tasley” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Accomack County, VA

All 47 PJM queue filings in Accomack County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first