Tasley substation interconnection queue
2 active projects totalling 16.1 MW in the PJM queue, plus 7 with terminal status (shown greyed).
2active projects
16.1active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-050 | Tasley 69kV | 69 | 20 | Battery | Withdrawn |
| C01-2179 | Tasley 24.9 kV | 24.9 | 9.4 | Battery | Active |
| AC1-009 | Tasley 69kV | 69 | 7.6 | Solar | Withdrawn |
| AB2-033 | Tasley 69kV | 69 | 7.2 | Solar | Withdrawn |
| T66 | Tasley | n/r | 6.7 | Other | In Service |
| AC1-052 | Tasley 69kV | 69 | 6.4 | Solar | Withdrawn |
| AF1-243 | Tasley 25 kV | 25 | 5 | Battery | Withdrawn |
| V4-022 | Tasley Solar | n/r | 1.9 | Solar | Withdrawn |
| AB2-030 | Tasley 25kV | 25 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.