Tasley substation interconnection queue

2 active projects totalling 16.1 MW in the PJM queue, plus 7 with terminal status (shown greyed).

2active projects
16.1active MW
9total filed
Queue IDProjectkVMWResourceStatus
AH2-050 Tasley 69kV 69 20 Battery Withdrawn
C01-2179 Tasley 24.9 kV 24.9 9.4 Battery Active
AC1-009 Tasley 69kV 69 7.6 Solar Withdrawn
AB2-033 Tasley 69kV 69 7.2 Solar Withdrawn
T66 Tasley n/r 6.7 Other In Service
AC1-052 Tasley 69kV 69 6.4 Solar Withdrawn
AF1-243 Tasley 25 kV 25 5 Battery Withdrawn
V4-022 Tasley Solar n/r 1.9 Solar Withdrawn
AB2-030 Tasley 25kV 25 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.