Wattsville substation interconnection queue

1 active project totalling 9 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
9active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF2-061 Scout Energy Storage 69 40 Battery Withdrawn
AF2-060 Scout Storage I 12 9 Battery Suspended
AE1-167 Wattsville 12 kV 12 6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.