Emporia-Trego substation interconnection queue
1 active project totalling 42 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
42active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-174 | Greensville County Solar Project | 115 | 42 | Solar | In Service |
| AI2-391 | Emporia-Trego 115kV | 115 | 13 | Solar | Withdrawn |
| AB1-070 | Emporia-Trego 115kV | 115 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.