Substation Scout

Oak Hall substation interconnection queue

8 active projects totaling 47.2 MW in the PJM queue, plus 2 with terminal status (shown grayed).

10 PJM queue filings name Oak Hall as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Dec 2011 to Dec 2017 (10 filings).

8active projects
47.2active MW
10total filed
Queue IDProjectkVMWResourceStatusTarget COD
W3-054A Oak Hall 138kV 138 12.4 Wind Withdrawn Jun 2013
W1-003 Oak Hall Project A n/r 7.6 Solar In Service Oct 2016
W1-004 Oak Hall Project B n/r 7.6 Solar In Service Dec 2016
W1-005 Oak Hall Project C n/r 7.6 Solar In Service Dec 2017
W1-006 Oak Hall Project D n/r 7.6 Solar In Service Dec 2017
W1-007 Oak Hall n/r 7.6 Solar Withdrawn Dec 2011
Z1-100 Oak Hal lProject A n/r 4.2 Solar In Service Oct 2016
Z1-101 Oak Hall Project B n/r 4.2 Solar In Service Dec 2016
Z1-102 Oak Hall Project C n/r 4.2 Solar In Service Dec 2017
Z1-103 Oak Hall n/r 4.2 Solar In Service Dec 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Oak Hall” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Accomack County, VA

All 47 PJM queue filings in Accomack County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first