Substation Scout

Wakefield substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).

Target commercial operation dates as filed run from Nov 2015 to Apr 2028 (8 filings).

Transmission owner as filed: Dominion (1 filing).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-428 Wakefield 115 kV 115 135.7 Hybrid Withdrawn Apr 2028
AC2-026 Wakefield 138kV 138 27.5 Solar Withdrawn Jun 2019
AF2-327 Wakefield 13 kV 13 16 Hybrid Withdrawn Aug 2023
AA2-163 Wakefield 12.5kV 12.5 14 Solar Withdrawn Nov 2015
AG1-245 Wakefield 12.47 kV 12.5 6.5 Solar Withdrawn Dec 2022
AH1-494 Wakefield 12 kV 12 6.4 Solar Withdrawn Jun 2024
AB1-155 Wakefield 34.5kV 34.5 3.8 Solar Withdrawn Oct 2017
AB1-159 Wakefield 34.5kV 34.5 3.8 Solar Withdrawn Oct 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, VA

All 39 PJM queue filings in Sussex County, VA.

Other PJM queue substations in Scioto County, OH

All 7 PJM queue filings in Scioto County, OH.

Other PJM queue substations in Lancaster County, PA

All 41 PJM queue filings in Lancaster County, PA.

Other PJM queue substations in Surry County, VA

All 43 PJM queue filings in Surry County, VA.