Wakefield substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).
Target commercial operation dates as filed run from Nov 2015 to Apr 2028 (8 filings).
Transmission owner as filed: Dominion (1 filing).
0active projects
0active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-428 | Wakefield 115 kV | 115 | 135.7 | Hybrid | Withdrawn | Apr 2028 |
| AC2-026 | Wakefield 138kV | 138 | 27.5 | Solar | Withdrawn | Jun 2019 |
| AF2-327 | Wakefield 13 kV | 13 | 16 | Hybrid | Withdrawn | Aug 2023 |
| AA2-163 | Wakefield 12.5kV | 12.5 | 14 | Solar | Withdrawn | Nov 2015 |
| AG1-245 | Wakefield 12.47 kV | 12.5 | 6.5 | Solar | Withdrawn | Dec 2022 |
| AH1-494 | Wakefield 12 kV | 12 | 6.4 | Solar | Withdrawn | Jun 2024 |
| AB1-155 | Wakefield 34.5kV | 34.5 | 3.8 | Solar | Withdrawn | Oct 2017 |
| AB1-159 | Wakefield 34.5kV | 34.5 | 3.8 | Solar | Withdrawn | Oct 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Sussex County, VA
- Carson-Suffolk: 1 active, 480 MW of 4 filed
- Carson-Rogers Road: 1 active, 207.2 MW of 2 filed
- Carson-Septa: 1 active, 90 MW of 2 filed
- Clubhouse-Sapony: 1 active, 89 MW of 2 filed
- Rogers Road - Carson: 1 active, 85 MW of 3 filed
- Waverly: 1 active, 80 MW of 3 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Bakers Pond-Ivor: 1 active, 43.3 MW of 2 filed
- Sapony: 2 active, 29.5 MW of 7 filed
- Bakers Pond-Bell Ave: none active of 2 filed
- Brunswick-Gasburg: none active of 2 filed
- Carson-Rawlings: none active of 2 filed
Other PJM queue substations in Scioto County, OH
- North Haverhill: 1 active, 75 MW of 2 filed
- Hanging Rock: 3 active, 51 MW of 5 filed
Other PJM queue substations in Lancaster County, PA
- Strasburg: 1 active, 250 MW of 4 filed
- Holtwood: 3 active, 249 MW of 3 filed
- Muddy Run: 1 active, 160 MW of 2 filed
- Quarryville: 1 active, 1.9 MW of 3 filed
- Honey Brook: 2 active, 1.6 MW of 2 filed
- TMI-Peach Bottom: none active of 4 filed
- Letort: none active of 3 filed
- West Hempfield: none active of 3 filed
- Brunner-West Hempfield: none active of 2 filed
- Cochranville-Peach Bottom: none active of 2 filed
- Face Rock-Kinzer #13: none active of 2 filed
- Rock Springs-Peach Bottom: none active of 2 filed
- South Akron: none active of 2 filed
- York: none active of 2 filed
Other PJM queue substations in Surry County, VA
- Surry: 10 active, 336.7 MW of 10 filed
- Septa: 2 active, 336.4 MW of 4 filed
- Hopewell-Surry: 4 active, 325.8 MW of 15 filed
- Colonial Trail - Surry: 1 active, 250 MW of 2 filed
- Surry-Hopewell: 1 active, 89 MW of 2 filed
- Poolesville: none active of 8 filed
Site Scanner