Clubhouse- Purdy substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 6 with terminal status (shown grayed).

6 PJM queue filings name Clubhouse- Purdy as the point of interconnection, all in Greensville County, VA.

Target commercial operation dates as filed run from Dec 2024 to Oct 2028 (6 filings).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-226 Clubhouse- Purdy 115kV 115 175 Battery Withdrawn Dec 2027
AH2-238 Clubhouse- Purdy 115kV 115 100 Battery Withdrawn Dec 2027
AH1-650 Clubhouse- Purdy 115kV 115 60 Solar Withdrawn Dec 2024
AH1-649 Clubhouse- Purdy 115kV 115 36 Solar Withdrawn Dec 2024
AI2-255 Clubhouse- Purdy 115kV 115 25 Solar Withdrawn Oct 2028
AI2-254 Clubhouse- Purdy 115kV 115 15 Solar Withdrawn Oct 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Greensville County, VA

All 58 PJM queue filings in Greensville County, VA.