Clubhouse-Lakeview substation interconnection queue

1 active project totalling 67 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
67active MW
3total filed
Queue IDProjectkVMWResourceStatus
AB2-100 Sadler Solar 230 67 Solar In Service
AB2-128 Clubhouse-Lakeview 230kV 230 57.4 Solar Withdrawn
AG2-059 Clubhouse-Lakeview 230 kV 230 52.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.