Clubhouse-Lakeview substation interconnection queue
1 active project totalling 67 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
67active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-100 | Sadler Solar | 230 | 67 | Solar | In Service |
| AB2-128 | Clubhouse-Lakeview 230kV | 230 | 57.4 | Solar | Withdrawn |
| AG2-059 | Clubhouse-Lakeview 230 kV | 230 | 52.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.