Brunswick-Gasburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-179 Brunswick-Gasburg 69 kV 69 33.7 Solar Withdrawn
AG1-180 Brunswick-Gasburg 69 kV 69 16.4 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.