Briery DP-Clover substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Briery DP-Clover as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Apr 2022 to Dec 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-328 | Briery DP-Clover 230 kV | 230 | 68.1 | Solar | Withdrawn | Apr 2022 |
| AG1-347 | Briery DP-Clover 230 kV | 230 | 56 | Hybrid | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Accomack County, VA
- Morrisville: 1 active, 400 MW of 12 filed
- Suffolk: 4 active, 120.8 MW of 14 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Oak Hall: 8 active, 47.2 MW of 10 filed
- Tasley: 2 active, 16.1 MW of 9 filed
- Wattsville: 1 active, 9 MW of 3 filed
- Northern Neck: 3 active, 8.4 MW of 6 filed
- Tasley-Kellam: none active of 4 filed
- Birchwood: none active of 3 filed
- Sowego: none active of 3 filed
- Bremo-Kidds Store: none active of 2 filed
- Carson – Rogers Road: none active of 2 filed
- New Church: none active of 2 filed
Other PJM queue substations in Lunenburg County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Chase City-Lunenburg: 2 active, 132.4 MW of 3 filed
- Lunenburg - Nutbush: 2 active, 56 MW of 2 filed
- Gary: 2 active, 12.3 MW of 4 filed