Birchwood substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| T149 | Birchwood 230kV | 230 | 580 | Gas | Withdrawn |
| AG2-303 | Birchwood 230 kV | 230 | 100 | Battery | Withdrawn |
| AG1-322 | Birchwood 230 kV | 230 | 70 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.