Birchwood substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
T149 Birchwood 230kV 230 580 Gas Withdrawn
AG2-303 Birchwood 230 kV 230 100 Battery Withdrawn
AG1-322 Birchwood 230 kV 230 70 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.