New Church substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name New Church as the point of interconnection, all in Accomack County, VA.
Target commercial operation dates as filed run from Dec 2016 to Dec 2022 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-231 | New Church 138 kV | 138 | 7.6 | Battery | Withdrawn | Dec 2022 |
| AA2-129 | New Church 138kV | 138 | 0 | Battery | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “New Church” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- New Church: Expansion Tracker, PJM planning: DPL state not printed
Other PJM queue substations in Accomack County, VA
- Morrisville: 1 active, 400 MW of 12 filed
- Suffolk: 4 active, 120.8 MW of 14 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Oak Hall: 8 active, 47.2 MW of 10 filed
- Tasley: 2 active, 16.1 MW of 9 filed
- Wattsville: 1 active, 9 MW of 3 filed
- Northern Neck: 3 active, 8.4 MW of 6 filed
- Tasley-Kellam: none active of 4 filed
- Birchwood: none active of 3 filed
- Sowego: none active of 3 filed
- Bremo-Kidds Store: none active of 2 filed
- Briery DP-Clover: none active of 2 filed
- Carson – Rogers Road: none active of 2 filed