Brink-Trego substation interconnection queue

3 active projects totalling 40.4 MW in the PJM queue.

3active projects
40.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AB1-173 Meherrin Solar 115 13.5 Solar In Service
AB1-173A Meherrin Solar 115 13.5 Solar In Service
AB2-031 Meherrin Solar 115 13.4 Solar In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.