Fields substation interconnection queue
2 active projects totaling 17 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Fields as the point of interconnection, all in Greensville County, VA.
Target commercial operation dates as filed run from Aug 2027 to Jan 2029 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
2active projects
17active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-299 | Jarratt Energy Facility 2 | 34.5 | 10.8 | Solar | Withdrawn | Jan 2029 |
| AF1-292 | Jarratt Solar | 34.5 | 8.9 | Solar | Under Construction | Aug 2027 |
| AG1-532 | Fields 2 | 34.5 | 8.1 | Solar | Under Construction | Jan 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Greensville County, VA
- Heritage-Carson: 1 active, 1,630 MW of 2 filed
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Carson-Rogers Road: 1 active, 207.2 MW of 2 filed
- Rogers Road - Carson: 1 active, 85 MW of 3 filed
- Carson-Rogers Rd: 1 active, 67.7 MW of 5 filed
- Rogers Road: 2 active, 67 MW of 5 filed
- Clubhouse-Lakeview: 1 active, 67 MW of 3 filed
- Brink: 1 active, 44 MW of 2 filed
- Emporia-Trego: 1 active, 42 MW of 3 filed
- Brink-Trego: 3 active, 40.4 MW of 3 filed
- Clubhouse- Purdy: none active of 6 filed
- Clubhouse: none active of 3 filed
- Carson – Rogers Road: none active of 2 filed
- Clubhouse-Freeman: none active of 2 filed