Carson-Suffolk substation interconnection queue
1 active project totalling 480 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
480active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-173 | Blackwater Solar | 500 | 480 | Solar | Under Construction |
| AG1-178 | Carson-Suffolk 500 kV | 500 | 324.9 | Solar | Withdrawn |
| AH2-150 | Carson-Suffolk 500 kV | 500 | 320 | Battery | Withdrawn |
| AG1-184 | Carson-Suffolk 500 kV | 500 | 175.1 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.