Substation Scout

Sussex, VA interconnection queue

16 active projects totalling 1,914.2 MW in the PJM queue, plus 23 with terminal status (shown greyed).

16active projects
1,914.2active MW
39total filed
Queue IDProjectkVMWResourceStatus
AE1-173 Blackwater Solar 500 480 Solar Under Construction
AG1-178 Carson-Suffolk 500 kV 500 324.9 Solar Withdrawn
AH1-166 Carson – Suffolk 500 kV 500 320 Battery Withdrawn
AH2-150 Carson-Suffolk 500 kV 500 320 Battery Withdrawn
C01-1623 Carson - Suffolk 500 kV 500 300 Battery Active
AE2-311 Carson-Septa 500 kV 500 240 Solar Withdrawn
C01-1496 Carson - Suffolk 500 kV (AE1-173 switching station) 500 240 Battery Active
AE2-094 Cassius Blue Solar 500 207.2 Hybrid Engineering and Procurement
AG1-184 Carson-Suffolk 500 kV 500 175.1 Battery Withdrawn
AE2-031 Carson-Rawlings 500 kV 500 174 Solar Withdrawn
AG2-436 Carson - Rogers Road 500 kV 500 140 Solar Active
AG2-428 Wakefield 115 kV 115 135.7 Hybrid Withdrawn
AE2-051 Big Pine Solar 500 90 Solar Engineering and Procurement
AE2-033 Enclave Solar Energy Center 230 89 Solar Suspended
AG2-339 Rogers Road - Carson 500 kV 500 85 Battery Active
C01-1224 Waverly 115 kV 115 80 Battery Active
AF1-069 Cassius Blue Solar 500 67.7 Hybrid Engineering and Procurement
AG2-427 Waverly 115 kV 115 66.3 Hybrid Withdrawn
AE2-157 Wakefield–Waverly 115 kV 115 60 Solar Withdrawn
AE1-085 Bakers Pond-Bell Ave 115 kV 115 50 Solar Withdrawn
AD1-034 Sapony 230 kV 230 44.9 Solar Withdrawn
AD1-082 Waverly Solar 115 43.3 Solar In Service
AF1-074 Waverly-Wakefield 115 kV 115 40.8 Solar Withdrawn
AG2-338 Rogers Road - Carson 500 kV 500 40 Battery Withdrawn
AI2-143 Clubhouse-Sappony 230 kV 230 37.7 Solar Withdrawn
AG1-179 Brunswick-Gasburg 69 kV 69 33.7 Solar Withdrawn
AG2-426 Wakefield - Waverly 115 kV 115 33.5 Hybrid Active
AI2-033 Sapony 34.5kV 34.5 24 Solar Withdrawn
AB2-161 Waverly Solar 115 19 Solar In Service
AG1-180 Brunswick-Gasburg 69 kV 69 16.4 Battery Withdrawn
AF2-327 Wakefield 13 kV 13 16 Hybrid Withdrawn
AE2-040 Shands Energy Center 34.5 15.7 Battery In Service
AA2-163 Wakefield 12.5kV 12.5 14 Solar Withdrawn
AB2-025 Sapony 34.5kV 34.5 13.8 Solar In Service
AG2-431 Sapony 34.5 kV 34.5 12.5 Solar Withdrawn
AI2-031 Sapnony 34.5kV 34.5 12 Solar Withdrawn
AI2-034 Distribution circuit#332 35kV 35 12 Solar Withdrawn
C01-1119 Enclave 230 kV 230 10 Solar Active
AE2-150 Bakers Pond-Bell Ave 115 kV 115 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.