Bakers Pond-Bell Ave substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-085 Bakers Pond-Bell Ave 115 kV 115 50 Solar Withdrawn
AE2-150 Bakers Pond-Bell Ave 115 kV 115 0 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.