Carson-Rawlings substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-313 Carson-Rawlings 500 kV 500 188.4 Solar Withdrawn
AE2-031 Carson-Rawlings 500 kV 500 174 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.