Carson-Rogers Road substation interconnection queue
1 active project totalling 207.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
207.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-069 | Carson-Rogers Road 500 kV | 500 | 254.5 | Solar | Withdrawn |
| AE2-094 | Cassius Blue Solar | 500 | 207.2 | Hybrid | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.