Morrisville substation interconnection queue

1 active project totalling 400 MW in the PJM queue, plus 11 with terminal status (shown greyed).

1active projects
400active MW
12total filed
Queue IDProjectkVMWResourceStatus
R77 Morrisville 500kV 500 600 Gas Withdrawn
S52 Morrisville 500kV 500 600 Gas Withdrawn
C01-1376 Morrisville 230 kV 230 400 Battery Active
AD2-190 Morrisville 230 kV 230 111.8 Solar Withdrawn
AE1-022 Morrisville 230 kV 230 111.8 Solar Withdrawn
AE1-044 Fitch Solar 230 111.8 Solar Withdrawn
AH1-086 Summersweet Energy Center, LLC 230 90 Battery Withdrawn
AD2-032 Morrisville 230 kV 230 83.8 Solar Withdrawn
AG2-644 Morrisville 230 kV 230 80 Battery Withdrawn
AH1-087 Summersweet Energy Center, LLC 230 20 Battery Withdrawn
AH1-088 Summersweet Energy Center, LLC 230 20 Battery Withdrawn
AH1-089 Summersweet Energy Center, LLC 230 20 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.