Substation Scout

Clubhouse substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-135 Clubhouse 230 kV 230 120 Hybrid Withdrawn
AE2-260 Clubhouse 230 kV 230 82.7 Hybrid Withdrawn
AC1-206 Clubhouse 230kV 230 57.7 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.