Bellefonte substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Bellefonte as the point of interconnection, all in Centre County, PA.
Target commercial operation dates as filed run from Oct 2011 to Dec 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-147 | Nittany Solar | 46 | 12 | Solar | Withdrawn | Dec 2022 |
| W1-104 | Bellefonte 12kV | 12 | 0.3 | Solar | Withdrawn | Oct 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Centre County, PA
- Eagle Valley: 2 active, 63.9 MW of 2 filed
- Philipsburg: 4 active, 62 MW of 6 filed
- Moshannon-Milesburg: 1 active, 50 MW of 2 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Nittany-Zion: none active of 3 filed
- Graymont-Zion: none active of 2 filed
- Madisonburg Jct-Millheim: none active of 2 filed
- Milesburg-Moshannon: none active of 2 filed
- Moshannon-Milesburg X: none active of 2 filed
- Shingletown-Boalsburg: none active of 2 filed