13 active projects totalling 871.3 MW in the PJM queue, plus 40 with terminal status (shown greyed).

13active projects
871.3active MW
53total filed
Queue IDProjectkVMWResourceStatus
AB1-175 Homer City-Mainesburg 345kV 345 960 Gas Withdrawn
AB1-144 Shawville Generating Station 230 590 Gas In Service
H15 Chapman-Moshannon 230kV 230 520 Gas Withdrawn
L19 Karthaus 230 290 Coal Withdrawn
AI1-039 Moshannon-Milesburg 230 kV VIII 230 160 Hybrid Withdrawn
AF1-100 Shawville-Moshannon 230 kV 230 150 Hybrid Withdrawn
AH1-624 Mainesburg-Homer City 345kV 345 138 Solar Withdrawn
C01-1746 Madera - Bionol 115 kV 115 130 Hybrid Active
AF1-142 Moshannon-Milesburg 230 kV IV 230 121.4 Hybrid Withdrawn
AF1-213 Bionol-Madera 115 kV 115 91.1 Solar Withdrawn
AH2-267 Modera - BioEnergy Tap 115 kV 115 85 Hybrid Withdrawn
AF1-099 Moshannon-Milesburg 230 kV III 230 75.9 Hybrid Withdrawn
AF1-274 Harvey Run 115 kV 115 51 Solar Withdrawn
AG2-688 Imperial-Joffre 138 kV 138 40 Battery Withdrawn
U1-050 Clearfield n/r 26 Wind Withdrawn
AF1-086 Rogue's Wind 115 20.5 Wind Partially in Service - Under Construction
AH1-746 Madera - Westover South 115 kV 115 20 Wind Active
AI2-436 Luthersburg - Curwensville 34.5 kV 34.5 20 Hybrid Withdrawn
C01-2127 Dubois 34.5 kV 34.5 20 Battery Active
C01-2134 Philipsburg 34.5 kV 34.5 20 Battery Active
U1-051 Clearfield n/r 16.9 Wind Withdrawn
AG1-395 Philipsburg-Karthaus 34.5 kV 2 34.5 15.4 Solar Withdrawn
R92 DuBois 115kV 115 14 Wind Withdrawn
C16 Westover South 34.5kV 34.5 13.5 Gas Withdrawn
AG2-668 Harvey Run 34.5 kV 34.5 12.5 Solar Withdrawn
AE2-126 CL-Viaduct 34.5 12 Solar In Service
AE2-128 Milesburg-Moshannon 230 kV 230 12 Solar Withdrawn
AE2-129 Philipsburg-Clarence 34.5 kV 34.5 12 Solar In Service
AF1-134 CL-Green Acres 34.5 12 Solar Under Construction
AF1-135 Madera 34.5 kV 34.5 12 Solar Withdrawn
AF2-296 CL- Belsena Solar 34.5 12 Solar EP
AG1-144 Phillipsburg 34.5 kV 34.5 12 Solar Withdrawn
AH2-401 Dubois 34.5 kV 34.5 12 Solar Withdrawn
AH2-402 Philipsburg 34.5 kV 34.5 12 Solar Withdrawn
AH1-667 Philipsburg-Shawville 34.5 kV 34.5 10.8 Solar Active
Q46 Sunnyside Ethonol 34.5 10 Coal Withdrawn
AI1-115 Glory 34.5 kV 34.5 9.9 Hybrid Withdrawn
AF1-095 Hertlein Road-Winburne 34 kV 34 9 Solar Withdrawn
AG1-308 Shawville-Philipsburg 34.5 kV 34.5 8.3 Solar Withdrawn
AG2-558 Shawville - Phillipsburg 34.5 kV II 34.5 8.3 Solar Withdrawn
AG2-559 Shawville - Phillipsburg 34.5 kV III 34.5 8.3 Solar Withdrawn
AG2-560 Phillipsburg (Karthaus) 34.5 kV 34.5 8.3 Solar Withdrawn
AF2-039 Abes Run Solar 34.5 8.1 Solar Under Construction
AI2-432 Philipsburg-Clarence 34.5 kV II 34.5 7.3 Solar Withdrawn
AI2-433 Dubois-Curwensville 34.5 kV II 34.5 7.3 Solar Withdrawn
AG1-242 Beccaria 34.5 kV 34.5 6.5 Solar Withdrawn
AH2-018 Lawrence 12.47 kV 12.5 6 Solar Withdrawn
AF2-088 Abes Run Solar 34.5 3.9 Solar Under Construction
AH1-514 Philipsburg - Emeigh 12.47 kV-1 12.5 3.4 Solar Withdrawn
AH2-044 Clearfield 12.5 kV 12.5 3.3 Solar Withdrawn
AH1-053 Luthersburg - Curwensville 12.47 kV 12.5 3 Solar Withdrawn
AH1-104 Hepburna 12.47 kV Grampian ckt 12.5 3 Solar Withdrawn
AH1-515 Philipsburg - Emeigh 12.47 kV-2 12.5 2.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.