Philipsburg substation interconnection queue

4 active projects totalling 62 MW in the PJM queue, plus 2 with terminal status (shown greyed).

4active projects
62active MW
6total filed
Queue IDProjectkVMWResourceStatus
AG1-090 Black Moshannon Solar 115 30 Hybrid EP
AI2-439 Philipsburg 115 kV 115 20 Hybrid Withdrawn
C01-2134 Philipsburg 34.5 kV 34.5 20 Battery Active
AH2-402 Philipsburg 34.5 kV 34.5 12 Solar Withdrawn
AG1-377 Black Moshannon Solar 115 6 Solar EP
AG1-378 Black Moshannon Solar 115 6 Solar EP

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.