Philipsburg substation interconnection queue

4 active projects totaling 62 MW in the PJM queue, plus 2 with terminal status (shown grayed).

6 PJM queue filings name Philipsburg as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Sep 2024 to Jun 2029 (6 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: PENELEC (4 filings).

4active projects
62active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-090 Black Moshannon Solar 115 30 Hybrid EP Jun 2029
AI2-439 Philipsburg 115 kV 115 20 Hybrid Withdrawn Dec 2027
C01-2134 Philipsburg 34.5 kV 34.5 20 Battery Active Dec 2028
AH2-402 Philipsburg 34.5 kV 34.5 12 Solar Withdrawn Sep 2024
AG1-377 Black Moshannon Solar 115 6 Solar EP Jun 2029
AG1-378 Black Moshannon Solar 115 6 Solar EP Jun 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Philipsburg (PENELEC, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Centre County, PA

All 53 PJM queue filings in Centre County, PA.

Other PJM queue substations in Clearfield County, PA

All 53 PJM queue filings in Clearfield County, PA.