Philipsburg substation interconnection queue
4 active projects totaling 62 MW in the PJM queue, plus 2 with terminal status (shown grayed).
6 PJM queue filings name Philipsburg as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Sep 2024 to Jun 2029 (6 filings). 4 active filings target a date after November 27, 2026.
Transmission owner as filed: PENELEC (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-090 | Black Moshannon Solar | 115 | 30 | Hybrid | EP | Jun 2029 |
| AI2-439 | Philipsburg 115 kV | 115 | 20 | Hybrid | Withdrawn | Dec 2027 |
| C01-2134 | Philipsburg 34.5 kV | 34.5 | 20 | Battery | Active | Dec 2028 |
| AH2-402 | Philipsburg 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Sep 2024 |
| AG1-377 | Black Moshannon Solar | 115 | 6 | Solar | EP | Jun 2029 |
| AG1-378 | Black Moshannon Solar | 115 | 6 | Solar | EP | Jun 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Philipsburg (PENELEC, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Centre County, PA
- Eagle Valley: 2 active, 63.9 MW of 2 filed
- Moshannon-Milesburg: 1 active, 50 MW of 2 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Nittany-Zion: none active of 3 filed
- Bellefonte: none active of 2 filed
- Graymont-Zion: none active of 2 filed
- Madisonburg Jct-Millheim: none active of 2 filed
- Milesburg-Moshannon: none active of 2 filed
- Moshannon-Milesburg X: none active of 2 filed
- Shingletown-Boalsburg: none active of 2 filed
Other PJM queue substations in Clearfield County, PA
- Dubois: 1 active, 20 MW of 2 filed
- Madera: 1 active, 12 MW of 2 filed
- Glory: 1 active, 6 MW of 2 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Lawrence: 1 active, 0.3 MW of 4 filed
- Clearfield: none active of 3 filed
- Harvey Run: none active of 2 filed
- Imperial-Joffre: none active of 2 filed
- Luthersburg - Curwensville: none active of 2 filed
- Milesburg-Moshannon: none active of 2 filed