Philipsburg substation interconnection queue
4 active projects totalling 62 MW in the PJM queue, plus 2 with terminal status (shown greyed).
4active projects
62active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-090 | Black Moshannon Solar | 115 | 30 | Hybrid | EP |
| AI2-439 | Philipsburg 115 kV | 115 | 20 | Hybrid | Withdrawn |
| C01-2134 | Philipsburg 34.5 kV | 34.5 | 20 | Battery | Active |
| AH2-402 | Philipsburg 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AG1-377 | Black Moshannon Solar | 115 | 6 | Solar | EP |
| AG1-378 | Black Moshannon Solar | 115 | 6 | Solar | EP |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.