Nittany-Zion substation interconnection queue

1 active project totalling 12 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
12active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-001 Confer Solar I 46 12 Solar Suspended
AF1-214 Nittany-Zion 46 kV 46 12 Solar Withdrawn
AG2-373 Nittany-Zion 46 kV 46 6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.