Eagle Valley substation interconnection queue

2 active projects totalling 63.9 MW in the PJM queue.

2active projects
63.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1275 Eagle Valley 115 kV 115 48.6 Wind Active
AD2-133 Sandy Ridge 115 15.3 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.