Eagle Valley substation interconnection queue
2 active projects totaling 63.9 MW in the PJM queue.
2 PJM queue filings name Eagle Valley as the point of interconnection, all in Centre County, PA.
Target commercial operation dates as filed run from Jul 2023 to Jun 2026 (2 filings).
Transmission owner as filed: PENELEC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1275 | Eagle Valley 115 kV | 115 | 48.6 | Wind | Active | Jun 2026 |
| AD2-133 | Sandy Ridge | 115 | 15.3 | Wind | In Service | Jul 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Eagle Valley (PENELEC, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Centre County, PA
- Philipsburg: 4 active, 62 MW of 6 filed
- Moshannon-Milesburg: 1 active, 50 MW of 2 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Nittany-Zion: none active of 3 filed
- Bellefonte: none active of 2 filed
- Graymont-Zion: none active of 2 filed
- Madisonburg Jct-Millheim: none active of 2 filed
- Milesburg-Moshannon: none active of 2 filed
- Moshannon-Milesburg X: none active of 2 filed
- Shingletown-Boalsburg: none active of 2 filed