Centre, PA interconnection queue

9 active projects totaling 212.9 MW in the PJM queue, plus 44 with terminal status (shown grayed).

9active projects
212.9active MW
53total filed
Queue IDProjectkVMWResourceStatus
D08_W19 Bald Eagle 46 kV 46 88 Gas Withdrawn
AH1-313 Nittany North Solar 230 60 Hybrid Withdrawn
AE2-262 MPG Solar 230 50 Solar Engineering and Procurement
AI2-233 Eagle Valley 115kV II 115 49.4 Wind Withdrawn
AG1-474 Not reported n/r 49 Hybrid Withdrawn
C01-1275 Eagle Valley 115 kV 115 48.6 Wind Active
AE2-263 MPG Solar 230 47 Solar Engineering and Procurement
AD2-119 Milesburg-Dale Summit 230kV 230 31.5 Solar Withdrawn
AG1-090 Black Moshannon Solar 115 30 Hybrid EP
AI2-383 Moshannon-Milesburg 230 kV X 230 26.3 Solar Withdrawn
AI2-379 Moshannon-Milesburg 230 kV X 230 24.5 Solar Withdrawn
AI2-154 Moshannon-Milesburg 230 kV IX 230 24 Solar Withdrawn
AI1-214 Philipsburg 115 kV IV 115 20 Hybrid Withdrawn
AI1-215 Philipsburg 115 kV V 115 20 Hybrid Withdrawn
AI1-216 Philipsburg 115 kV VI 115 20 Hybrid Withdrawn
AI2-439 Philipsburg 115 kV 115 20 Hybrid Withdrawn
AI2-440 Phillipsburg 115 kV 115 20 Hybrid Withdrawn
AI1-217 Philipsburg 115 kV VII 115 17 Hybrid Withdrawn
AD2-133 Sandy Ridge 115 15.3 Wind In Service
AF1-068 Boalsburg-Centre Hall 46 kV 46 12.8 Solar Withdrawn
AE1-147 Nittany Solar 46 12 Solar Withdrawn
AE2-001 Confer Solar I 46 12 Solar Withdrawn
AE2-055 Windmill Road 46 12 Solar Withdrawn
AE2-120 CE-Shady Farm LLC 46 12 Solar Withdrawn
AE2-127 Milesburg-Moshannon 230 kV 230 12 Solar Withdrawn
AF1-097 Zion-E College Ave 34 kV 34 12 Solar Withdrawn
AF1-132 Shingletown-Boalsburg 46 kV 46 12 Solar Withdrawn
AF1-149 Graymont-Zion 46 kV 46 12 Solar Withdrawn
AF1-214 Nittany-Zion 46 kV 46 12 Solar Withdrawn
AG2-413 Brush Junction - Pleasant Gap 46 kV 46 12 Hybrid Withdrawn
AG2-557 Spring Mills - Millheim 46 kV 46 11.9 Solar Withdrawn
U2-055 Karthaus-Milesburg 230kV 230 11.5 Wind Withdrawn
AA1-085 Centre County Wind Facility 230 10.7 Wind Withdrawn
Q36 Sandy Ridge WF 115 10 Wind In Service
AE2-248 CE-FILMORE 46 9.6 Solar Withdrawn
Y3-010 Brush Junction-Millheim 46kV 46 9.1 Wind Withdrawn
AF1-112 Centre Hall 46 8.9 Solar Withdrawn
AG1-258 Madisonburg Jct-Millheim 46 kV 46 8.3 Solar Withdrawn
AH1-668 Madisonburg Jct-Millheim 46 kV 46 8.3 Solar Withdrawn
U1-038 Millheim n/r 6.5 Wind Withdrawn
W1-012 Millheim-Brush Jct 46kV 46 6.5 Wind Withdrawn
AE2-121 CE-JACKSONVILLE 46 6.4 Solar Withdrawn
AG2-554 East End 46 kV 46 6.2 Solar Withdrawn
AG1-377 Black Moshannon Solar 115 6 Solar EP
AG1-378 Black Moshannon Solar 115 6 Solar EP
AG2-373 Nittany-Zion 46 kV 46 6 Solar Withdrawn
AI1-128 Milesburg 12.47 kV 12.5 5 Hybrid Withdrawn
W2-069 Fishburn/Tanney 46kV 46 3.8 Solar Withdrawn
AI2-017 PA Centre Borealis 34.5 kV 34.5 3 Solar Withdrawn
W1-104 Bellefonte 12kV 12 0.3 Solar Withdrawn
AC1-025 State College Pumping Station Battery n/r 0 Battery In Service
AG2-099 Moshannon-Milesburg 230 kV V 230 0 Battery Withdrawn
AG2-100 Moshannon-Milesburg 230 kV VI 230 0 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.