Madera substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Madera as the point of interconnection, all in Clearfield County, PA.
Target commercial operation dates as filed run from Apr 2022 to Dec 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PENELEC (1 filing).
1active projects
12active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-135 | Madera 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Apr 2022 |
| AF2-296 | CL- Belsena Solar | 34.5 | 12 | Solar | EP | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Clearfield County, PA
- Philipsburg: 4 active, 62 MW of 6 filed
- Dubois: 1 active, 20 MW of 2 filed
- Glory: 1 active, 6 MW of 2 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Lawrence: 1 active, 0.3 MW of 4 filed
- Clearfield: none active of 3 filed
- Harvey Run: none active of 2 filed
- Imperial-Joffre: none active of 2 filed
- Luthersburg - Curwensville: none active of 2 filed
- Milesburg-Moshannon: none active of 2 filed