Clearfield substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U1-050 | Clearfield | n/r | 26 | Wind | Withdrawn |
| U1-051 | Clearfield | n/r | 16.9 | Wind | Withdrawn |
| AH2-044 | Clearfield 12.5 kV | 12.5 | 3.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.