Graymont-Zion substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Graymont-Zion as the point of interconnection, all in Centre County, PA.
Target commercial operation dates as filed run from Mar 2021 to Dec 2025 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-120 | CE-Shady Farm LLC | 46 | 12 | Solar | Withdrawn | Dec 2025 |
| AF1-149 | Graymont-Zion 46 kV | 46 | 12 | Solar | Withdrawn | Mar 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Centre County, PA
- Eagle Valley: 2 active, 63.9 MW of 2 filed
- Philipsburg: 4 active, 62 MW of 6 filed
- Moshannon-Milesburg: 1 active, 50 MW of 2 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Nittany-Zion: none active of 3 filed
- Bellefonte: none active of 2 filed
- Madisonburg Jct-Millheim: none active of 2 filed
- Milesburg-Moshannon: none active of 2 filed
- Moshannon-Milesburg X: none active of 2 filed
- Shingletown-Boalsburg: none active of 2 filed
Site Scanner