Graymont-Zion substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Graymont-Zion as the point of interconnection, all in Centre County, PA.

Target commercial operation dates as filed run from Mar 2021 to Dec 2025 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-120 CE-Shady Farm LLC 46 12 Solar Withdrawn Dec 2025
AF1-149 Graymont-Zion 46 kV 46 12 Solar Withdrawn Mar 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.