Luthersburg - Curwensville substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-436 | Luthersburg - Curwensville 34.5 kV | 34.5 | 20 | Hybrid | Withdrawn |
| AH1-053 | Luthersburg - Curwensville 12.47 kV | 12.5 | 3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.