Dubois substation interconnection queue

1 active project totaling 20 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Dubois as the point of interconnection, all in Clearfield County, PA.

Target commercial operation dates as filed run from Jul 2024 to Dec 2028 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PENELEC (1 filing).

1active projects
20active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2127 Dubois 34.5 kV 34.5 20 Battery Active Dec 2028
AH2-401 Dubois 34.5 kV 34.5 12 Solar Withdrawn Jul 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Dubois (PENELEC, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Clearfield County, PA

All 53 PJM queue filings in Clearfield County, PA.