Harmony Solar Farm

PJM queue ID W1-127

Harmony Solar Farm (W1-127) is listed in the PJM interconnection queue as a 1.1 MW solar project in Warren County, NJ. The filing names Phillipsburg as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2015.

Queue IDW1-127
Project nameHarmony Solar Farm
Status (as published)In Service
SubstationPhillipsburg
Point of interconnectionPhillipsburg 12.47kV
CountyWarren
StateNJ
Voltage12.5 kV
Capacity1.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2015-09-30
Source datasetserial

Same substation and county

Phillipsburg substation: 8 requests in the PJM queue, 2 active totaling 4.1 MW.

Queue IDProjectMWResourceStatus
W4-073Hamptons at Pohatcong Solar Farm3SolarIn Service
AI2-440Phillipsburg 115 kV20HybridWithdrawn
AG1-144Phillipsburg 34.5 kV12SolarWithdrawn
W3-151Phillipsburg 34.5kV6.1SolarWithdrawn
X1-006Phillipsburg1.8SolarWithdrawn
X4-047Phillipsburg1.5SolarWithdrawn
X2-081Phillipsburg0.6SolarWithdrawn

Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy3
MW capacity1.1
MFO3

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.