Letort substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
O01 Frey Farms LF 12 3.2 Gas Withdrawn
V3-051 Turkey Hill Dairy WF n/r 0.4 Wind Deactivated
AF2-279 LA-Blue Rock 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.