Surry substation interconnection queue

10 active projects totaling 336.7 MW in the PJM queue.

10 PJM queue filings name Surry as the point of interconnection, all in Surry County, VA.

Target commercial operation dates as filed run from May 2010 to Jun 2028 (10 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

10active projects
336.7active MW
10total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1118 Surry 230 kV 230 75 Battery Active Mar 2027
S114 Surry Power Station - Units 1 & 2 230 75 Nuclear In Service Sep 2012
S115 Surry Power Station - Units 1 & 2 500 75 Nuclear In Service Jul 2011
S82 Gravel Neck Gas Turbine #3 230 19 Gas In Service May 2010
S83 Gravel Neck Gas Turbine #4 230 19 Gas In Service May 2010
S84 Gravel Neck Gas Turbine #5 230 19 Gas In Service May 2010
S85 Gravel Neck Gas Turbine #6 230 19 Gas In Service May 2010
S111 Surry Power Station - Units 1 & 2 500 15 Nuclear In Service Jun 2011
S113 Surry Power Station - Units 1 & 2 230 15 Nuclear In Service Jun 2011
C01-1162 Surry 230 kV 230 5.7 Nuclear Active Jun 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Surry (DOM, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Surry County, VA

All 43 PJM queue filings in Surry County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first