Surry substation interconnection queue
10 active projects totaling 336.7 MW in the PJM queue.
10 PJM queue filings name Surry as the point of interconnection, all in Surry County, VA.
Target commercial operation dates as filed run from May 2010 to Jun 2028 (10 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1118 | Surry 230 kV | 230 | 75 | Battery | Active | Mar 2027 |
| S114 | Surry Power Station - Units 1 & 2 | 230 | 75 | Nuclear | In Service | Sep 2012 |
| S115 | Surry Power Station - Units 1 & 2 | 500 | 75 | Nuclear | In Service | Jul 2011 |
| S82 | Gravel Neck Gas Turbine #3 | 230 | 19 | Gas | In Service | May 2010 |
| S83 | Gravel Neck Gas Turbine #4 | 230 | 19 | Gas | In Service | May 2010 |
| S84 | Gravel Neck Gas Turbine #5 | 230 | 19 | Gas | In Service | May 2010 |
| S85 | Gravel Neck Gas Turbine #6 | 230 | 19 | Gas | In Service | May 2010 |
| S111 | Surry Power Station - Units 1 & 2 | 500 | 15 | Nuclear | In Service | Jun 2011 |
| S113 | Surry Power Station - Units 1 & 2 | 230 | 15 | Nuclear | In Service | Jun 2011 |
| C01-1162 | Surry 230 kV | 230 | 5.7 | Nuclear | Active | Jun 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Surry (DOM, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Surry County, VA
- Septa: 2 active, 336.4 MW of 4 filed
- Hopewell-Surry: 4 active, 325.8 MW of 15 filed
- Colonial Trail - Surry: 1 active, 250 MW of 2 filed
- Surry-Hopewell: 1 active, 89 MW of 2 filed
- Poolesville: none active of 8 filed
- Wakefield: none active of 8 filed