Scioto, OH interconnection queue
1 active project totalling 75 MW in the PJM queue, plus 6 with terminal status (shown greyed).
1active projects
75active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X1-027 | Hanging Rock 138kV | 138 | 200 | Coal | Withdrawn |
| T152 | North Haverhill 69kV | 69 | 140 | Coal | Withdrawn |
| N12 | North Haverhill | 69 | 75 | Coal | In Service |
| AD2-078 | N. Haverhill 69kV | 69 | 40 | Coal | Withdrawn |
| AD1-141 | S. Lucasville-Wakefield 138 kV | 138 | 30 | Solar | Withdrawn |
| AC2-026 | Wakefield 138kV | 138 | 27.5 | Solar | Withdrawn |
| AC2-047 | Ashley-Millbrook Park 69 kV | 69 | 7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.