Substation Scout

Holtwood substation interconnection queue

3 active projects totalling 249 MW in the PJM queue.

3active projects
249active MW
3total filed
Queue IDProjectkVMWResourceStatus
Q20 Holtwood n/r 140 Hydro In Service
G36 Holtwood n/r 107 Hydro In Service
L08 Holtwood 69 2 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.