Strasburg substation interconnection queue
2 active projects totalling 390 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
390active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1876 | Strasburg 138 kV | 138 | 250 | Battery | Active |
| AI1-186 | Strasburg 138 kV | 138 | 140 | Battery | Withdrawn |
| C01-2049 | Strasburg 138 kV | 138 | 140 | Battery | Active |
| W2-059 | Sight & Sound Theaters | 12 | 1 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.