Substation Scout

Strasburg substation interconnection queue

1 active project totalling 250 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
250active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1876 Strasburg 138 kV 138 250 Battery Active
AI1-186 Strasburg 138 kV 138 140 Battery Withdrawn
C01-2049 Strasburg 138 kV 138 140 Battery Withdrawn
W2-059 Sight & Sound Theaters 12 1 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.