Quarryville substation interconnection queue
1 active project totalling 1.9 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
1.9active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| B39 | Quarryville 69kV | 69 | 90 | Gas | Withdrawn |
| V4-027 | Keystone Solar | n/r | 1.9 | Solar | In Service |
| AC2-170 | Keystone Solar | n/r | 1.1 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.