Quarryville substation interconnection queue

1 active project totalling 1.9 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
1.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
B39 Quarryville 69kV 69 90 Gas Withdrawn
V4-027 Keystone Solar n/r 1.9 Solar In Service
AC2-170 Keystone Solar n/r 1.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.